Construction of Fly-Over Bridge at Sirmour Chouraha Rewa on Varanasi Nagpur Road at Km. 234/6 in Rewa city NH 7 M.P.
09
Construction of Coffer dam and 2 nos. Sluice at RD 457.57 (Left Bank) & RD 5100 M (Right Bank) of Pench Division Dam Except Earth of Bund in Sluice portion Pench Division Project.
08
Restructuring and Modernization of Samrat Ashok Sagar Project.
07
Construction of Aqueduct at RD 30725 M and 40100 M of Mahan Main Canal.
06
Construction of Bridge across Johilla River on Pali Raipur Road in KM 12/10.
05
Construction of Aqueduct at KM 21.75, 41.01, 56.26 & 64.60 of Purwa Main Canal (at Lilji Nala, Kariyari Nala, Nar Nala, Magardaha Nala Respectively.)
04
“Construction of Aqueduct / Syphon Aqueduct on Tamas river for main canal of Teonthar flow Irrigation Scheme including construction of balancing reservoir and lined canal on upstream of river crossing with all appurtenant works on Turnkey (Survey, Planning, Investigation, Design, drawing & built with preparation of Land Acquisition & Forest cases, shifting of L.T., H.T. electric lines and water supply lines and other obstruction in canal alignment) basis including all auxiliary work with defect liability period of two years.”
03
Construction of Pench Valley Group Water Supply Scheme- Head Work (Mandhan Dam)
02
Development of Sidhi City Portion Road in Km 74 to 83/4 on NH-75 Extn. Road. (Total length 9.40 Km)