S.No. 43 | Name of Work : Jamuniya Micro Irrigation Project Chhindwara (M.P.) |
||||||
|
|||||||
S.No. 42 | Name of Work : Const. of Sidhi to Sirsi Road L-28.30 KM, Under Sub Dn. Sidhi Distt. Sidhi. |
||||||
|
|||||||
S.No. 41 | Name of Work : Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawal- Tuipang Section of NH-54 in the State of Mizoram on Engineering. Procurement and construction (EPC) Mode. With Japan International Cooperation Agency (JICA) Loan Assistance. |
||||||
|
|||||||
S.No. 40 | Name of Work : On Turn-Key Basis conveying of water for hose irrigation System from Chhitakhudri and Hiran Reservoir of District Jabalpur (M.P.). |
||||||
|
|||||||
S.No. 39 | Name of Work : Construction of Single/Multiple Dam under Kanyakhedi Irrigation Project on river Dudhi. |
||||||
|
|||||||
S.No. 38 | Name of Work : CONSTRUCTION OF BRIDGES ON STATE HIGHWAYS AND MAJOR DISTRICT ROADS. PACKAGE 19 |
||||||
|
|||||||
S.No. 37 | Name of Work : Construction of New Railway Over Bridge on Varanasi Nagpur Road (NH-7) near Railway Station Rewa at Railway CH-890M across RewaSidhi New Railway line at Godhar Distt. Rewa (M.P.) Executive Engineer PWD Bridge Construction Division, Rewa (M.P.) |
||||||
|
S.No. 36 | Name of Work : Supplying of water from Left side of Pench Dam basin by lifting and delivering at farmer’s field @ duty 0.36 litre/sec/ha through pressurized pipeline system for Jamuniya Micro Irrigation system. | ||||||||||||
|
|||||||||||||
S.No. 35 | Name of Work : “Construction of Aqueduct / Syphon Aqueduct on Tamas river for main canal of Teonthar flow Irrigation Scheme including construction of balancing reservoir and lined canal on upstream of river crossing with all appurtenant works on Turnkey (Survey, Planning, Investigation, Design, drawing & built with preparation of Land Acquisition & Forest cases, shifting of L.T., H.T. electric lines and water supply lines and other obstruction in canal alignment) basis including all auxiliary work with defect liability period of two years.” | ||||||||||||
Coming soon.. | |||||||||||||
|
|||||||||||||
S.No. 34 | Name of Work : Construction of Submersible Bridge including Approach road across sone river near village Bhitari on Rampur Ghunghuta Khaira Road Distt .Sidhi M.P. | ||||||||||||
|
|||||||||||||
S.No. 33 | Name of Work : L -Earth Work on bund, construction of flush bar, Head Sluice, Approach & Spill Channel, Chute Falls, Construction of Canal, Canal Structure and Canal Lining OF BICHHLI NALLA TANK SCHEME | ||||||||||||
|
|||||||||||||
S.No. 32 | Name of Work : “Construction of Keshwani to Bamhani Road Length 5.00 KM | ||||||||||||
|
|||||||||||||
S.No. 31 | Name of Work : Construction Of High Level Bridge Across Tawa River At Rajdhoghat On Sarni-LoniyaRaod Including Approch Road Distt. Betul. | ||||||||||||
|
|||||||||||||
S.No. 30 | Name of Work : Construction of high level bridge (total length 88.0 mtrs) at River Mandhan under pench valley group water supply project. | ||||||||||||
|
|||||||||||||
S.No. 29 | Name of Work : Development of Sidhi City Portion Road in Km 74 to 83/4 on NH-75 Extn. Road. (Total length 9.40 Km) | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 28 | Name of Work : Construction of industrial Infrastructural Development Works for Upgradation of Industrial Area, At Udyog Viharchuratha, Dist. Rewa, M.P. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 27 | Name of Work : Construction of high level bridge include approach road across bais river in Km. 2 of Udaigiri-Dholkhedi road Distt. Vidisha. (M.P). | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 26 | Name of Work : Construction of Composite Dam at Mandhan Nalla Pench Valley Group Water Supply Scheme- Head Work (Mandan Dam). | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 25 | Name of Work : Construction Of Submersible Bridge Including Approach Road Across Myar River On Chachar- Kulhai (Kulhaniya) Road Distt. Singrauli. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 24 | Name of Work : Construction of Fly-Over Bridge at Sirmour Chouraha Rewa on Varanasi Nagpur Road at Km. 234/6 in Rewa city NH 7 M.P. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 23 | Name of Work : Construction of Coffer dam and 2 nos. Sluice at RD 457.57 (Left Bank) & RD 5100 M (Right Bank) of Pench Division Dam Except Earth of Bund in Sluice portion Pench Division Project. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 22 | Name of Work : Restructuring & Modernization of Banchore Tank &there canal System. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 21 | Name of Work : Restructuring and Modernization of Samrat Ashok Sagar Project. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 20 | Name of Work : B.T.R. on Leela Tola Medhakhar Road Km. 1 to 7.80 & Leela tola Seoni Sangam Road 2.20 Km. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 19 | Name of Work : B.T.R. on Rajendra Gram Dharamdas Jaitahari Road 1 to 4 Km. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 18 | Name of Work : B.T.R. on Nonghati Damehari Road Km. 1 to 9 & 18 to 21= 16 Km. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 17 | Name of Work : 20. Construction of Aqueduct at RD 30725 M and 40100 M of Mahan Main Canal. | ||||||||||||
Coming Soon.. | |||||||||||||
|
|||||||||||||
S.No. 16 | Name of Work : “Construction of Pench Valley Group Water Supply Scheme- Head Work (Mandhan Dam) | ||||||||||||
|
|||||||||||||
S.No. 15 | Name of Work : “Construction Of Submersible Bridge Including Approach Road Across Myar River On Chachar- Kulhai (Kulhaniya) Road Distt. Singrauli. | ||||||||||||
|
|||||||||||||
S.No. 14 | Name of Work : Construction of Fly-Over Bridge at Sirmour Chouraha Rewa on Varanasi Nagpur Road at Km. 234/6 in Rewa city NH 7 M.P. |
||||||||||||
|
|||||||||||||
S.No. 13 | Name of Work : Construction of Coffer dam and 2 nos. Sluice at RD 457.57 (Left Bank) & RD 5100 M (Right Bank) of Pench Division Dam Except Earth of Bund in Sluice portion Pench Division Project. | ||||||||||||
|
|||||||||||||
S.No. 12 | Name of Work : Restructuring and Modernization of Samrat Ashok Sagar Project. | ||||||||||||
|
|||||||||||||
S.No. 11 | Name of Work : Restructuring & Modernization of Banchore Tank & there canal System. | ||||||||||||
|
|||||||||||||
S.No. 10 | Name of Work : B.T.R. on Leela Tola Medhakhar Road Km. 1 to 7.80 & Leelatola Seoni Sangam Road 2.20 Km. | ||||||||||||
P | |||||||||||||
|
|||||||||||||
S.No. 09 | Name of Work : B.T.R. on Rajendragram Dharamdas Jaitahari Road 1 to 4 Km. | ||||||||||||
|
|||||||||||||
S.No. 08 | Name of Work : B.T.R. on Nonghati Damehari Road Km. 1 to 9 & 18 to 21= 16 Km. | ||||||||||||
|
|||||||||||||
S.No. 07 | Name of Work : Construction of Aqueduct at RD 30725 M and 40100 M of Mahan Main Canal. | ||||||||||||
|
|||||||||||||
S.No. 06 | Name of Work :Construction of Bridge across Johilla River on Pali Raipur Road in KM 12/10. | ||||||||||||
|
|||||||||||||
S.No. 05 | Name of Work : Restructuring & Modernization of Karmodia Tank & there canal system. | ||||||||||||
|
|||||||||||||
S.No. 04 | Name of Work : B.T.R. on Anuppur town Road Length 2 Km. | ||||||||||||
|
|||||||||||||
S.No. 03 | Name of Work : B.T.R. on Anuppur Venkanagar Road = 14 Km. | ||||||||||||
|
|||||||||||||
S.No. 02 | Name of Work : Restructuring & Modernization of Ratapani tank & there canal system. | ||||||||||||
|
|||||||||||||
S.No. 01 | Name of Work : Construction of Aqueduct at KM 21.75, 41.01, 56.26 & 64.60 of Purwa Main Canal (at Lilji Nala, Kariyari Nala, Nar Nala, Magardaha Nala Respectively.) | ||||||||||||
|