The total contract value of the ongoing projects exceeds ₹3,000 crore
| S. No. | Name of Contract | Location | Department Name |
1 |
Construction, Operation and Maintenance of Sher Irrigation Complex Project, Dams with all ancillary works, Piped Irrigation system to supply water through pressurized pipeline system for micro irrigation” |
Chhindwara (M.P.) |
Executive Engineer, Pench Diversion Dam W. R. Division No. 1 Chourai, Distt. Chhindwara (M.P.) |
2 |
Construction of a Pressurized Pipe Irrigation System Pench Micro Irrigation Complex 2 under Pench Diversion Project. |
Chhindwara (M.P.) |
Executive Engineer, Pench Diversion Project Canal Division, Signa Chourai, Distt Chhindwara (MP) |
3 |
Engineering, Procurement, Construction, Testing, Commissioning, Trial Run and Operation & Maintenance of Various Components of Waidhan 2 Multi-Village Scheme, District Singrauli in Single Package on ‘Turn-Key Job Basis’ including Trial Run and Operation & Maintenance of the Entire Scheme for 10 Years. |
Singrauli (M.P.) |
General Manager Madhya Pradesh Jal Nigam Maryadit Project Implementation Unit, Singrauli (MP) |
4 |
Construction of a Pressure Irrigation System to supply water through the Rising/ Gravity mains by pressurized pipeline system for Bhanni Micro Irrigation. |
Shahdol (M.P.) |
Executive Engineer Water Resources Division No. 2 Shahdol (M.P.) |
5 |
Construction of a Pressurised Pipe Irrigation System to supply water through the Rising/ Gravity mains for Sirmour Micro Irrigation Project of distt. Rewa (M.P.). |
Rewa (M.P.) |
Executive Engineer, Teonthar Canal Division, Sirmour Distt. Rewa (M.P.) |
6 |
Construction, Operation and Maintenance of Machhrewa Project on Machhrewa River distt. Narsinghpur with minimum gross storage capacity of 72.38 MCM on turn key basic |
Chhindwara (M.P.) |
Executive Engineer Pench diversion Dam WR Division no -01 chourai, Chhindwara. |
7 |
Construction of KapuriBaghauBithauliSajwani Road (M.D.R.) in Km 1/2 to 35/10, Length 35.00 Km. |
Sidhi (M.P.) |
Executive Engineer PWD Division SIdhi (M.P.) |
8 |
Construction of Railway Over Bridge on Salichaukha Gadawara Road at Level Crossing No. 257 at Railway KM 858/2-4 Jamada yard in Itarsi-Jabalpur Major Section on Jabalpur in District Narsinghpur |
Jabalpur (M.P.) |
EE, PWD Bridge Construction Division Jabalpur |
9 |
Construction Work of Flyover at Junction of Bhopal Dewas Road and Bhopal Bypass Road Near Phanda Village on Bhopal Dewas Road in the State of Madhya Pradesh on EPC Mode. |
Bhopal (M.P.) |
Managing Director, M P Road Development Corporation Ltd 45A, Arera Hills, Bhopal (M.P.). |
10 |
Upgradation of Shahdol, Maika Lafda, Chuhri Road (MDR) length 34.40 Km. under Division Shahdol. |
Shahdol (M.P.) |
Executive Engineer, PWD B/R Division Shahdol (M.P.) |
11 |
Construction of Submersible Bridge including approach road across Myar River on Chachar to Jaraha Road dist. Singrouli (M.P.) |
Rewa (M.P.) |
Executive Engineer, PWD Bridge Construction Division Rewa |
12 |
Construction of Submersible Bridge including approach road across Myar River on Baheri to Ukhadawar Road dist. Singrouli (M.P.) |
Rewa (M.P.) |
Executive Engineer, PWD Bridge Construction Division Rewa |
13 |
Construction of Padari Dam Main Canal Road and Minor Canal Road Length 17.76 K.M., Under Sub Division Chitrangi |
Shitrangi (M.P.) |
Executive Engineer |
14 |
Water Supply from Kodapar to Thanaud Village through a Pipeline along the Alignment of the Mahanadi Main Canal (MMC) to Nava Raipur Atal Nagar, Dist. Raipur (C.G.) |
Raipur (C.G) |
Nava Raipur Atal Nagar Vikas Pradhikaran (NRANVP) Paryavas Bhawan, North Block, Sector- 19, Nava Raipur Atal Nagar, Dist Raipur (CG) |
15 |
Selection of Irrigation Service Provider for the development of Pressurized Piped Irrigation Network (PPIN) and Provision of Irrigation services in Bagiya Cluster at Maini River of District: Jashpur (C.G.) under Modernization of Command Area Development (M-CAD) –SAMRIDDHI) Scheme for CCA of 4933 Ha. |
Jashpur (C.G) |
Executive Engineer |
16 |
Construction of Distribution System for 1500 ha. (CCA) of Naren Dist. off-taking at RD 49.38KM of Left Main Canal of Lower Indra Irrigation Project (Additional Ayacut) including Command area Development (CAD) through UGPL Irr. System in Balangir Dist. |
Balangir (Odisha) |
Superintending Engineer Lower Indra Canal Division No. III, Bangomunda, AT/PO Borbahal, Distt. Balangir (Odisha). |
17 |
Construction of Pipe Distribution Network (PDN) System for Dy. No. 2 including their Sub Distributaries and their Minors & Sub Minors & Formation of WUA Running and Maintenance for Five Years and Handling over the system to WUA @ Delivery Chamber of Degaon L.I.S. |
Solapur Maharashtra |
Executive Engineer, Ujjani Canal Division No. 8, Solapur, Under Maharashtra Krishna Valley Development Corporation Pune, Govt. of Maharashtra, |
18 |
Construction of Residual work, Reconstruction work, Repair & Maintenance works, Structural work in Head works, Main Canal & Right Branch Canal and its Distributaries/Sub Distributaries/ Minors through Open channel/UGPL under Konar Irrigation Project on Turn Key basis with 10 (Ten) years Operation, Maintenance and Management (OMM) |
Bagodar Jharkhand |
Executive Engineer, Konar Canal Division, Bagodar, (Giridih) |
19 |
Construction of High-Level Bridge across Sone River on Beohari- Katni Road in KM 37/10 Vijaysota Road in Distt. Shahdol (M.P.) |
Shahdol (M.P.) |
Executive Engineer PWD Bridge Construction Division Rewa (M.P.) |
20 |
Construction of Submersible Bridge including Approach Road Across Odari River on DhodhaBelha Road Distt. Shahdol (M.P.) |
Rewa (M.P.) |
Executive Engineer PWD Bridge Construction Division, Rewa (M.P.) |